研究生: |
張以達 |
---|---|
論文名稱: |
高科技半導體廠建廠管理之研究– 以中科12吋半導體廠為例 Managing the Building of a High-Tech Semiconductor Fab in CTSP |
指導教授: | 林博文 博士 |
口試委員: | |
學位類別: |
碩士 Master |
系所名稱: |
科技管理學院 - 高階經營管理碩士在職專班 Executive Master of Business Administration(EMBA) |
論文出版年: | 2005 |
畢業學年度: | 93 |
語文別: | 中文 |
論文頁數: | 143 |
中文關鍵詞: | 建廠管理 、半導體廠房 、時間 、成本 、品質 、安全 |
外文關鍵詞: | Construction Management, Semiconductor Fab, Schedule, Cost, Quality, Safety |
相關次數: | 點閱:2 下載:0 |
分享至: |
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
高科技產業隨著技術不斷加速更新,產品之生命週期不斷縮短,為了爭取競爭優勢與降低生產成本,必須透過廠房之興建將所研發之產品在短時間內大量投入生產,以搶得市場機會並提升市場佔有率。因此,興建高科技廠房必須具備健全之建廠管理模式,以解決建廠過程中必須面對之各種問題。
本文即針對高科技半導體廠房的建廠管理之程序與意涵,作一有系統的整理,並探討時間、成本、品質與安全等四個建廠指標在建廠專案管理流程中所扮演的角色;藉由進行個案實務管理之資料收集及深度分析,探討某公司中科12吋半導體晶圓廠運用四個建廠指標之管理模式及其關鍵成功因素。分析之個案獲得了成本合於預算,品質合於設計規範,安全零重大意外災害及刷新台灣12吋半導體晶圓廠最快速建廠,完成四個成功的建廠指標,並可推得成功的主因為建廠管理內涵,亦即專案組織之規劃管理與執行能力,佐以高層主管的支持與授權、建廠小組間之溝通協調、建廠小組之執行力、承攬商之向心力等管理因素。並證明本文所彙整研究發展之建廠程序的實用性。
Company in the high tech industry find that with technology renewing accelerate, life cycle of the product unceasingly reduces. In order to get the competitive advantage and reduce the production cost, they have to build new fab and to do mass production of their R&D product in a short time, in order to grip the opportunity of new releasing and gain the market share. Therefore, sound construction management for high tech fab building is required to solve the problems during the construction process.
This thesis focuses on systematically compiling the procedures and means for high-tech semiconductor fab construction management, and discussing the four key issues - schedule, cost, quality and safety – playing the roles in the construction management. Through the study and analysis of a real case management, construction of one semiconductor 12” fab in CTSP is discussed to find how the construction teams adapt the four key issues to manage their construction and the key factors for their success. This case shows their success in four aspects - cost meeting their budget, quality meeting their specifications, no serious injury for safety and achieving the fastest schedule among all the semiconductor 12” fab in Taiwan. It is concluded that the major reasons for their success is to well understand the true meaning of construction management – the planning and management competence of the construction teams, along with top-managers’ support and empowerment, communication and coordination between all the project team members, the enforcement of the teams, and vendors’ focus on the project. Meanwhile, the procedures of construction management complied by this thesis are proven to have its practicability by the case.
一、英文部分
Archibald, R. D. (1976). Managing High-technology Program and Projects. John Wiley & Sons.
Chase, R. B., Aquilano, N. J. and Jacobs, F. R. (1998). Production Operations Management: Manufacturing and Services. McGraw-Hill.
Garold, D. (1993). Oberlender, Project Management for Engineering and Construction. (2nd edition) McGraw-Hill.
The PMI Standard Committee (2000). “A guide to the project management body of knowledge”, Project Management Journal.
二、中文部分
中國生產力中心(1989),研究發展管理手冊,pp.6-11。
王慶富(2000),專案管理,聯經書局。
宋顯榮(1996),「鋼廠建廠工程營建管理之探討」,營造天下,10:頁15-18。
周文賢、柯國慶(1994),工程專案管理,華泰書局。
林士熙(2003),高科技廠商建廠成功的關鍵因素探討,國立清華大學高階經營管理碩士論文。
張書萍(2000),高科技廠房營建工程特性之調查與分析,國立交通大學土木工程研究所碩士論文。
許光華等(2003),專案管理,國立空中大學。
許榮榕(1995),系統方法專案管理,天一書局。
陳泓文(2004),施工安全評估,新文京開發出版股份有限公司。
陳勝朗(2000),建廠工程基本設計方法概論,科技圖書股份有限公司。
鄭奕孟、曾仁杰(2001),「臺灣高科技電子廠房施工問題之探討」,土木水利,27(4):頁102-112。